Remove Benchmarking Remove Case Studies Remove Engineering Remove Video
article thumbnail

Five Ways to Spur Lean in the Office

Markovitz Consulting

If meeting takt time is not an issue—for example, in closing the books at the end of the month— then measure and benchmark the time it takes to perform those tasks and challenge the team to figure out how to do them faster. How long does the item of work—an invoice, a customer order, an engineering change order, etc.—sit